NEW QUESTION # 38
Your production planners must execute planning only for specific resources. How can you achive this in advanced Planning(PP/DS)
- A. Use a planning group.
- B. Use a propagation range.
- C. Use heuristic.
- D. Use a resource group.
Answer: C
NEW QUESTION # 39
You want to create a production order from a planned order. What methods could you use?
- A. Order release
- B. Collective conversion
- C. Partial conversion
- D. Combined conversion
Answer: B,C
NEW QUESTION # 40
Which materials have a negative quantity in a bill of materials or in a recipe?
- A. Waste products
- B. Co-products
- C. Bulk materials
- D. By-products
- E. Continuous flow materials
Answer: B,D,E
NEW QUESTION # 41
You want to schedule an operation finitely, without moving other operations. Which scheduing strategy do you select?
- A. Schedule in working time only
- B. Find slot
- C. Insert operation
- D. Squeeze in
Answer: B
NEW QUESTION # 42
What happens to this dependent requirement when you convert the planned order into a production order?
- A. They are converted into a schedule line.
- B. They are converted into a reservation.
- C. They are converted into a planned order.
- D. They are converted into a production order.
Answer: B
NEW QUESTION # 43
You want to reduce planning efforts for B/C materials. Which planning procedure do you recommend?
- A. Material requirements planning
- B. Manual planning without check
- C. Consumption-based planning
- D. Forecast planning
Answer: C
NEW QUESTION # 44
Which actions does the system preform by default when you save a confirmation for a finished product in repetitive manufacturing?
- A. Posting of production costs to the production cost collector
- B. Material staging for nex order in sequence
- C. Archiving of documents for assembly scrap
- D. Posting of goods receipt for the product
- E. Reduction of associated capacity requirements
Answer: A,D,E
NEW QUESTION # 45
An issue storage location was NOT found through the work center, bill of material(BOM) item, or material master. What determines whether the storage location can be derived from the production version?
- A. MRP controller
- B. MRP profile
- C. MRP group
- D. Plants parameters
Answer: C
NEW QUESTION # 46
You set up a material as a phantom assembly by entering the special procurement key in the material master.
How can you switch off the phantom assembly in a specific bill of material (BOM)?
- A. Change the item category of the phantom assembly in the BOM.
- B. Change the phantom item indicator for the phantom assembly in the BOM.
- C. Change the explosion type of the phantom assembly in the BOM.
- D. Change the special procurement key of the phantom assembly in the BOM.
Answer: C
NEW QUESTION # 47
Which master data object governs the relationship between supply source and demand source in the Kanban process?
- A. Rate routing
- B. Production supply area
- C. Control cycle
- D. Replenishment strategy
Answer: C
NEW QUESTION # 48
Your quality department detect a deviation in a raw material batch. Unfortunately, this batch has already been used in producion. How can you indentify all affected finish goods stocks?
- A. Use the batch information cockpit.
- B. Use the material staging report.
- C. Use the material where-used report.
- D. Use batch determination.
Answer: A
NEW QUESTION # 49
When do you use variant bills of materials (BOMs)?
- A. When a material has a configurable BOM
- B. When multiple materials have multiple BOMs
- C. When multiple materials also have similar BOMs
- D. When a material has multiple BOMs
Answer: B
NEW QUESTION # 50
You want to insert an operatio at a certain time on work center. The planning direction is forward. The disired dispatching time concides with an operation that has previously been dispatched. How does the insertion take place?
- A. The previously dispatched operation stays as is; the new operation is inserted before the the dispatched operation.
- B. The previously dispatched operation stays as is; the new operation is inserted after the the dispatched operation.
- C. The new operation is inserted at the desired time; the previously dispatched operation is moved forward.
- D. The new operation is inserted at the desired time; the previously dispatched operation is moved backward.
Answer: D
NEW QUESTION # 51
How can you set up the supply source for the Kanban process in SAP S/4HANA?
- A. Using purchasing costs for automated source prioritization
- B. Using stock transfer reservations for stock transfer
- C. Using run schedule quantities for in-house production
- D. Using quotations for internal and external procurement
- E. Using purchase orders for external procurement
Answer: B,C,E
NEW QUESTION # 52
Which chart types does the tabular planning table provide in SAP S/4HANA
- A. Order (dispatched) chart
- B. Work center capacities chart
- C. Order (pool) chart
- D. Capacity requirements chart
Answer: B,D
NEW QUESTION # 53
For a production version to be valid and consistent what requirements must be fulfilled?
- A. The assigned routing and bill of materials (BOM) must be valid in the entire validity period.
- B. The assigned routing must NOT have alternative sequences.
- C. The lot size range must be within the lot-size range of the assigned routing.
- D. The deletion flag must NOT be set for the bill of materials (BOM) or the routing.
- E. The assigned routing must be a rate routing.
Answer: A,C,D
NEW QUESTION # 54
For which categories can you define BOMs in SAP S/4HANA?
- A. Work Center
- B. Sales order
- C. Class
- D. Document Structure
Answer: B,D
NEW QUESTION # 55
You are working with planning strategy 40 (Planning-with-final assembly) When does consuption of planned independent requirements take places?
- A. When the MRP result are saved
- B. When you create a sales order
- C. When you create a planned order
- D. When you deliver a sales order
Answer: B
NEW QUESTION # 56
What could be the reason for multiple commitment of invidula capacities, where several operations have the same scheduled dates on a work center (or resource) after planing?
- A. The Change Planning Direction indicator is set in strategy profile.
- B. The finite Scheduling indicator is NOT set in the strategy profile.
- C. Alternative work centers are fully occupied.
- D. The work center has several invidula capacities.
Answer: B,D
NEW QUESTION # 57
Your company produces a finished good based on a forecast and expects it to being stock when customers order it. If customers order more than the forecasted quantity, the production quantity should be increased to try to meet the extra demand. Which planning strategy do you use?
- A. Planning with final assembly (40)
- B. Make-to-order production (20)
- C. Planning without final assembly (50)
- D. Make-to-stock production (10)
Answer: A
NEW QUESTION # 58
Your proyect team decides to use a make-to-order planning strategy for strategic in discrete manufacturing.
What is the impact of this decision?
- A. Net requirement calcualtion is sales-order specific.
- B. Storage location MRP areas are required.
- C. A sales-order-specific planning run is required.
- D. Production orders specific stock is created
Answer: A,C,D
NEW QUESTION # 59
......