
SAP New 2024 C_IBP_2305 Test Tutorial (Updated 86 Questions)
C_IBP_2305 Exam Questions Dumps, Selling SAP Products
SAP C_IBP_2305 Exam Syllabus Topics:
| Topic | Details |
|---|---|
| Topic 1 |
|
| Topic 2 |
|
| Topic 3 |
|
NEW QUESTION # 18
You created a key figure and want to add calculations.Which of the following rules do you consider?Note:
There are 2 correct answers to this question.
- A. Aggregation calculations using SUM or MAX functions must be based on a higher aggregation level.
- B. The calculation chain for a key figure must always result in a calculated key figure.
- C. Key figures can be calculated across different planning levels.
- D. All key figure calculations have calculation inputs, which can be marked as stored or calculated.
Answer: C,D
NEW QUESTION # 19
You are evaluating criteria for choosing the solver to support planning for a complex supply chain. What are some of the points that should be reviewed?Note: There are 2 correct answers to this question.
- A. Finite heuristics can achieve demand prioritization and pegging.
- B. Planning results can be generated faster by the optimizer.
- C. Prioritization of demand elements one by one is achieved by unconstrained heuristics.
- D. Push and Pull production models are used by the optimizer.
Answer: A,D
NEW QUESTION # 20
You are configuring disaggregation for the KF1 key figure in the Planning Areas Model Configuration app.Which methods can you use?Note: There are 3 correct answers to this question.
- A. Disaggregation according to an equal split
- B. Disaggregation in batch triggered by an application job
- C. Proportional disaggregation by using KF2 in the expression
- D. Disaggregation according to a user-defined expression
- E. Disaggregation according to a helper key figure
Answer: A,C,D
NEW QUESTION # 21
What is a prerequisite for modeling outsourced manufacturers with production capacity using the Supply Optimizer?
- A. Use production lead times and offsets to manage components at the outsourced manufacturing location
- B. Model target inventory and stocks at the outsourced manufacturing location
- C. Model relative production costs across internal locations and outsourced manufacturing locations
- D. Ensure that the outsourced manufacturing locations have a separate subnetwork
Answer: C
NEW QUESTION # 22
Safety Stock outputs from Multistage Inventory Optimization are sent to which of these processes? Note:
There are 2 correct answers to this question.
- A. Charts creation in SAP Supply Chain Control Tower
- B. Demand Sensing with Gradient Boosting (Full)
- C. Decoupling Points determination in SAP IBP for demand-driven replenishment
- D. Supply Heuristics in SAP IBP for sales and operations
Answer: B,D
NEW QUESTION # 23
You are working on a mid-range plan that spans the seasonal peak and you are evaluating the need for additional crewing.Which of the following parameters can you model to plan production with extra shift(s)?
- A. Capacity expansion with additional costs
- B. Adjusted production interactive values
- C. Incremental production values
- D. Production source validity at the start of seasonal peak
Answer: A
NEW QUESTION # 24
You are developing the functionality and appearance of the Excel UI for SAP IBP business users.Which extensibility capabilities for SAP IBP, add-in for Microsoft Excel are provided by Custom VBA coding?Note:
There are 2 correct answers to this question.
- A. Changing the member names
- B. Changing the entries from the Name Manager
- C. Changing the layout of the master data workbooks
- D. SAP IBP ribbon extension
Answer: C,D
NEW QUESTION # 25
SAP IBP ensures interoperability with which applications?Note: There are 2 correct answers to this question.
- A. Salesforce Sales Cloud
- B. User management in SAP Success Factors
- C. Business Network in SAP Ariba
- D. Financial Planning in SAP Analytics Cloud
Answer: C,D
NEW QUESTION # 26
You create a planning filter using an SAP IBP Fiori app.Which of the following objects can it be applied to?Note: There are 2 correct answers to this question.
- A. Jobs in the Applications Jobs app
- B. Planning view templates in the SAP IBP add-in for Microsoft Excel
- C. Snapshot operator in the SAP IBP add-in for Microsoft Excel
- D. Supply chain graph in Supply Chain Network app
Answer: A,B
NEW QUESTION # 27
Which applications are present in the sample model SAPIBP1?Note: There are 3 correct answers to this question.
- A. Demand Sensing
- B. Demand Driven Replenishment
- C. Response Planning
- D. Inventory Optimization
- E. Sales and Operations Planning
Answer: A,D,E
NEW QUESTION # 28
Which of these conditions must be met to create a Local Member key figure?Note: There are 2 correct answers to this question.
- A. A key figure is selected in the Key Figures tab in the SAP IBP, add-in for Microsoft Excel.
- B. Users should have authorization for template administration.
- C. Activate Local Member Recognition setting is selected.
- D. Use Excel Cell References in the Report Editor option is selected.
Answer: B,C
NEW QUESTION # 29
Model configuration allows the attributes of a master data type to be assigned as key figures.Which features are relevant for this type of object?
- A. This type of key figure is not usually stored and it cannot be set to editable.
- B. This object contains user-defined criteria that monitor the running of business plans.
- C. This object is not exposed to the user in planning views or modeling.
- D. This object provides a single value for a unique planning combination.
Answer: D
NEW QUESTION # 30
What are some of the capabilities of the Planner Workspaces app? Note: There are 2 correct answers to this question.
- A. It supports sharing with other users or user groups.
- B. It supports simulating the effect of the changes
- C. It supports favorites created in SAP IBP, add-in for Microsoft Excel
- D. It supports embedding analytic stories as a workspace component
Answer: C,D
NEW QUESTION # 31
Which of the following are functions of SAP IBP for demand?Note: There are 2 correct answers to this question.
- A. Demand sensing of demand data using predictive analytics tools
- B. Detailed statistical analysis of demand data using predictive analytics tools
- C. Consideration of demand-driven analysis for buffer positioning.
- D. Embedded, on-the-fly demand analytics
Answer: B,D
NEW QUESTION # 32
Which constraints are taken into account by the Time-Series-Based Supply Planning Heuristic (Infinite)?Note:
There are 3 correct answers to this question.
- A. Minimum lot size
- B. Transportation lead times
- C. Adjusted transport receipts
- D. Aggregated constraints
- E. Maximum lot size
Answer: B,C,E
NEW QUESTION # 33
Time profiles are made out of levels, and levels are made out of periods.Which ways can SAP IBP identify profiles and periods?Note: There are 2 correct answers to this question.
- A. Both periods and profiles have start and end dates.
- B. Periods are identified by an integer and profiles by an alphanumeric prefix.
- C. Periods are identified by an alphanumeric prefix and profiles by an integer.
- D. Both periods and profiles are identified by a unique integer.
Answer: B,C
NEW QUESTION # 34
You are reviewing the master data types that are often used for supply and inventory planning
.Which master data types are compound master data types?Note: There are 2 correct answers to this question.
- A. SOURCECUSTOMER
- B. SOURCEPRODUCTION
- C. SOURCELOCATION
- D. SOURCECUSTGROUP
Answer: A,C
NEW QUESTION # 35
Analytics charts are created by the user in the Advanced Analytics application.What can the user do in the Advanced Analytics app?Note: There are 2 correct answers to this question.
- A. Merge charts together.
- B. Open graphics in Excel.
- C. Apply filters on your data.
- D. Group data.
Answer: C,D
NEW QUESTION # 36
Which of the following are inputs to Demand Sensing with Gradient Boosting (Full) algorithm?Note: There are 2 correct answers to this question.
- A. Recommended Safety Stocks from Multistage Inventory Optimization
- B. Forecast Error CV Calculated by Manage Forecast Error Calculations app
- C. Future Consensus Forecasts and Lagged Forecast Snapshots
- D. Sales Order Quantities (both historical and future open orders)
Answer: A,C
NEW QUESTION # 37
You are implementing SAP IBP to plan for a supply chain that experiences high seasonality.What supply planning operators can be used in your model to plan stock pre-builds?
- A. Finite heuristics only
- B. Finite and infinite heuristics
- C. Supply optimizer and supply heuristics
- D. Supply optimizer only
Answer: C
NEW QUESTION # 38
Which of the following are features of the S&OP process templates?Note: There are 2 correct answers to this question.
- A. Each step depicted in the template can have tasks associated with it.
- B. The S&OP process step can be started with an application job.
- C. New instances of templates allow for re-use of the same processes.
- D. All process templates are assigned to dashboards.
Answer: A,C
NEW QUESTION # 39
......
C_IBP_2305 Cert Guide PDF 100% Cover Real Exam Questions: https://braindumps.testpdf.com/C_IBP_2305-practice-test.html
